redux-framework
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u249119901/domains/termodonsa.com/public_html/wp-includes/functions.php on line 6121dustra
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u249119901/domains/termodonsa.com/public_html/wp-includes/functions.php on line 6121Categoría: Recubrimiento Refractario, Aislamiento térmico.
Cliente: GENERAL ELETRIC INTERNACIONAL INC.
Proyecto: GENERADORA DE ELECTRICIDAD ITABO, S. A. Turbina Potencia eléctrica de 128 MW para la unidad 1 y de 132 MW para la unidad 2.