Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u249119901/domains/termodonsa.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the dustra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u249119901/domains/termodonsa.com/public_html/wp-includes/functions.php on line 6121
Empresa generadora de electricidad ITABO, S. A. – Termodonsa
Cliente
ITABO
Arquitecto
Termodonsa S.R.L.

Información del Proyecto.

Categoría: Recubrimiento Refractario, Aislamiento térmico.

Cliente: GENERAL ELETRIC INTERNACIONAL INC.

Proyecto: GENERADORA DE ELECTRICIDAD ITABO, S. A. Turbina Potencia eléctrica de 128 MW para la unidad 1 y de 132 MW para la unidad 2.

Imagenes del proyecto